Traffic

Newstalk650 CKOM Traffic

Jay Thomas is your eyes and ears on the street in the CKOM Traffic vehicle. Stay tuned for updates and follow Jay on twitter for the very latest in Saskatoon traffic news.

Follow on Twitter: @ckomtraffic

April 28

Road Work For Friday

NEW

SPADINA CRESCENT ROAD CLOSED FROM 2ND AVENUES TO 3RD AVENUE
(crane lift)
Start: April 28, 6:00 a.m. End: April 28, 5:00 p.m.

HIGHWAY 11 SOUTH BOUND CURB LANE CLOSED FROM HIGHWAY 16 TO VICTOR ROAD
(ditch grading)
Start: April 28, 7:00 a.m. End: April 28, 6:00 p.m.

33RD STREET EAST & WEST BOUND MEDIAN LANES CLOSED AT AVENUE E
(sanitary lining)
Start: April 28, 9:00 a.m. End: April 28, 3:00 p.m.

22ND STREET EAST BOUND CURB & PARKING LANE CLOSED FROM 3RD AVENUES TO 4TH AVENUE
(directional boring)
Start: April 28, 9:00 a.m. End: April 28, 3:00 p.m.

ONGOING

21ST STREET PARKING RESTRICTIONS FROM 3RD AVENUE TO 4TH AVENUE
(streetscape restoration)
Start: April 4, 8:00 a.m. End: April 30, 5:00 p.m.

SPADINA CRESCENT EAST BOUND LANES CLOSED FROM AVENUE E TO AVENUE D
(curb replacement)
Start: April 26, 7:00 a.m. End: May 2, 5:00 p.m.

SPADINA CRESCENT WEST EAST BOUND LANES CLOSED FROM AVENUE H TO 17TH STREET
(curb replacement)
Start: April 26, 7:00 a.m. End: May 2, 5:00 p.m.

MCORMOND DRIVE NORTH BOUND CLOSED FROM EVERGREEN BOULEVARD TO FEDORUK DRIVE
(road restoration)
2-way traffic maintained in SB lanes
Start: April 24, 9:00 a.m. End: May 15, 6:00 p.m.

April 27

Road Work For Thursday

NEW

8TH STREET EAST BOUND CURB LANE CLOSED AT ALBERT AVENUE NEAR CLARENCE AVENUE
(sanitary sewer lining)
Start: April 27, 9:00 a.m. End: April 27, 5:00 p.m.

IDYLWYLD DRIVE NORTH & SOUTH BOUND MEDIAN LANES CLOSED FROM 39TH STREET TO 40TH STREET
(guardrail repair)
Start: April 27, 9:00 a.m. End: April 27, 3:00 p.m.

33RD STREET MEDIAN & LEFT TURN LANES CLOSED AT CONFEDERATION DRIVE
(sewer inspections)
Start: April 27, 11:00 a.m. End: April 27, 1:00 p.m.

HIGHWAY 16 PHASE 1 EAST & WEST BOUND CURB LANES, PHASE 2 EAST & WEST BOUND MEDIAN LANES AT BOYCHUK DR
(removal of advanced warning signals)
Start: April 27, 9:00 a.m. End: April 27, 1:00 p.m.

NIGHTWORK

2ND AVENUE NORTH & SOUTH BOUND LEFT TURN BAYS CLOSED AT 26TH STREET
(sanitary sewer inspection)
Start: April 27, 10:00 p.m. End: April 28, 7:00 a.m.

ONGOING

IDYLWYLD DRIVE NORTH BOUND MEDIAN LANE FROM CIRCLE DRIVE NORTH TO 44TH STREET
(guardrail repair)
Closure will be set daily between 09:00 & 15:00
Start: April 26, 9:00 a.m. End: April 27, 3:00 p.m.

21ST STREET PARKING RESTRICTIONS FROM 3RD AVENUE TO 4TH AVENUE
(streetscape restoration)
Start: April 4, 8:00 a.m. End: April 30, 5:00 p.m.

SPADINA CRESCENT EAST BOUND LANES CLOSED FROM AVENUE E TO AVENUE D
(curb replacement)
Start: April 26, 7:00 a.m. End: May 2, 5:00 p.m.

SPADINA CRESCENT WEST EAST BOUND LANES CLOSED FROM AVENUE H TO 17TH STREET
(curb replacement)
Start: April 26, 7:00 a.m. End: May 2, 5:00 p.m.

MCORMOND DRIVE NORTH BOUND CLOSED FROM EVERGREEN BOULEVARD TO FEDORUK DRIVE
(road restoration)
2-way traffic maintained in SB lanes
Start: April 24, 9:00 a.m. End: May 15, 6:00 p.m.

April 26

Road Work For Wednesday

NEW

20TH STREET ROAD CLOSED FROM AVENUE H TO AVENUE I
(roadway patching)
Start: April 26, 7:00 a.m. End: April 26, 12:00 p.m.

SPADINA CRESCENT WEST EAST BOUND LANES CLOSED FROM AVENUE H TO 17TH STREET
(curb replacement)
Start: April 26, 7:00 a.m. End: May 2, 5:00 p.m.

IDYLWYLD DRIVE NORTH BOUND MEDIAN LANE FROM CIRCLE DRIVE NORTH TO 44TH STREET
(guardrail repair)
Closure will be set daily between 09:00 & 15:00
Start: April 26, 9:00 a.m. End: April 27, 3:00 p.m.

IDYLWYLD DRIVE SOUTH BOUND TO EAST BOUND LEFT TURN BAY CLOSED FROM 71ST STREET TO MARQUIS DRIVE
(traffic detector repairs)
Start: April 26, 9:00 a.m. End: April 26, 1:00 p.m.

HIGHWAY 5 EAST BOUND MEDIAN LANE CLOSED AT MCORMOND DRIVE
(removal of the advance warning flasher)
Start: April 26, 9:00 a.m. End: April 26, 1:00 p.m.

HIGHWAY 5 WEST BOUND MEDIAN LANE AT MCORMOND DRIVE
(removal of the advance warning flasher)
Start: April 26, 9:00 a.m. End: April 26, 1:00 p.m.

ONGOING

QUEEN STREET INTERSECTION CLOSED AT 4TH AVENUE
(water valve replacement)
Start: April 25, 9:00 a.m. End: April 26, 5:00 p.m.

MCKERCHER DRIVE NORTH BOUND CURB & PARKING LANE CLOSED FROM TAYLOR STREET TO HOLLAND ROAD
(concrete work)
Start: April 24, 7:00 a.m. End: April 26, 5:00 p.m.

21ST STREET PARKING RESTRICTIONS FROM 3RD AVENUE TO 4TH AVENUE
(streetscape restoration)
Start: April 4, 8:00 a.m. End: April 30, 5:00 p.m.

MCORMOND DRIVE NORTH BOUND CLOSED FROM EVERGREEN BOULEVARD TO FEDORUK DRIVE
(road restoration)
2-way traffic maintained in SB lanes
Start: April 24, 9:00 a.m. End: May 15, 6:00 p.m.

April 25

Road Work For Tuesday

NEW
TAYLOR STREET INTERSECTION CLOSED AT LOUISE AVENUE
(roadway patching)
Start: April 25, 7:00 a.m. End: April 25, 5:00 p.m.

TAYLOR STREET WEST BOUND LANES CLOSED AT CLARENCE AVENUE
(roadway patching)  2-way traffic in EB lanes
Start: April 25, 7:00 a.m. End: April 25, 12:00 p.m.

CLARENCE AVENUE NORTH & SOUTH BOUND CLOSED FROM HILLIARD STREET TO MCKINNON AVENUE
(roadway patching)
Start: April 25, 7:00 a.m. End: April 25, 11:00 a.m.

CLARENCE AVENUE SOUTH BOUND LANES CLOSED FROM 1ST STREET TO TAYLOR STREET
(roadway patching)
Start: April 25, 7:00 a.m. End: April 25, 12:00 p.m.

CUMBERLAND AVENUE SOUTH BOUND LANES CLOSED FROM TAYLOR STREET TO ISABELLA STREET
(roadway patching)
Start: April 25, 7:00 a.m. End: April 25, 12:00 p.m.

ADELAIDE STREET ROAD CLOSED FROM LOUISE AVENUE TO EWART AVENUE
(roadway patching)
Start: April 25, 7:00 a.m. End: April 25, 12:00 p.m.

AIRPORT DRIVE EAST BOUND MEDIAN LANE CLOSED, WEST BOUND CURB LANE CLOSED FROM CARDINAL CRESCENT TO CIRCLE DRIVE WEST
(sanitary sewer inspections)
Start: April 25, 10:00 p.m. End: April 25, 12:00 a.m.

HIGHWAY 11 NORTH BOUND CURB LANE CLOSED AT HIGHWAY 16
(streetlight repair)
Start: April 25, 9:00 a.m. End: April 25, 3:00 p.m.

QUEEN STREET INTERSECTION CLOSED AT 4TH AVENUE
(water valve replacement)
Start: April 25, 9:00 a.m. End: April 26, 5:00 p.m.

ONGOING

IDYLWYLD DRIVE NORTH & SOUTH BOUND MEDIAN LANES CLOSED AT 8TH STREET
(guardrail repairs)
Closure will be set from 09:00 to 15:00 daily.
Start: April 24, 9:00 a.m. End: April 25, 3:00 p.m.

AIRPORT DRIVE NORTH, SOUTH & EAST BOUND MEDIAN LANES CLOSED FROM CLAYPOOL DRIVE TO CYNTHIA STREET
(manhole repairs)
Start: April 20, 9:00 a.m. End: April 25, 4:00 p.m.

SPADINA CRESCENT WEST BOUND PARKING LANE CLOSURE FROM AVENUE D TO AVENUE H
(road work)
Start: April 17, 7:00 a.m. End: April 25, 5:00 p.m.

MCKERCHER DRIVE NORTH BOUND CURB & PARKING LANE CLOSED FROM TAYLOR STREET TO HOLLAND ROAD
(concrete work)
Start: April 24, 7:00 a.m. End: April 26, 5:00 p.m.

21ST STREET PARKING RESTRICTIONS FROM 3RD AVENUE TO 4TH AVENUE
(streetscape restoration)
Start: April 4, 8:00 a.m. End: April 30, 5:00 p.m.

MCORMOND DRIVE NORTH BOUND CLOSED FROM EVERGREEN BOULEVARD TO FEDORUK DRIVE
(road restoration)
2-way traffic maintained in SB lanes
Start: April 24, 9:00 a.m. End: May 15, 6:00 p.m.

April 24

Road Work For Monday

NEW

MCKERCHER DRIVE NORTH BOUND CURB & PARKING LANE CLOSED FROM TAYLOR STREET TO HOLLAND ROAD
(concrete work)
Start: April 24, 7:00 a.m. End: April 26, 5:00 p.m.

108TH STREET EAST & WEST BOUND CLOSED FROM EGBERT AVENUE TO MORAN AVENUE
(roadway patching)
Start: April 24, 7:00 a.m. End: April 24, 12:00 p.m.

HIGHWAY 11 SOUTH BOUND CURB LANE CLOSED FROM HIGHWAY 16 TO VICTOR ROAD
(ditch grading)
Start: April 24, 8:00 a.m. End: April 24, 6:00 p.m.

IDYLWYLD DRIVE NORTH & SOUTH BOUND MEDIAN LANES CLOSED AT 8TH STREET
(guardrail repairs)
Closure will be set from 09:00 to 15:00 daily.
Start: April 24, 9:00 a.m. End: April 25, 3:00 p.m.

3RD AVENUE CLOSED FROM KING STREET TO 26TH STREET
(valve replacement)
Start: April 24, 9:00 a.m. End: April 24, 4:00 p.m.

QUEEN STREET CLOSED FROM 2ND AVENUE TO 4TH AVENUE
(valve replacement)
Start: April 24, 9:00 a.m. End: April 24, 4:00 p.m.

MCORMOND DRIVE NORTH BOUND CLOSED FROM EVERGREEN BOULEVARD TO FEDORUK DRIVE
(road restoration)
2-way traffic maintained in SB lanes
Start: April 24, 9:00 a.m. End: May 15, 6:00 p.m.

ONGOING

AIRPORT DRIVE NORTH, SOUTH & EAST BOUND MEDIAN LANES CLOSED FROM CLAYPOOL DRIVE TO CYNTHIA STREET
(manhole repairs)
Start: April 20, 9:00 a.m. End: April 25, 4:00 p.m.

SPADINA CRESCENT WEST BOUND PARKING LANE CLOSURE FROM AVENUE D TO AVENUE H
(road work)
Start: April 17, 7:00 a.m. End: April 25, 5:00 p.m.

21ST STREET PARKING RESTRICTIONS FROM 3RD AVENUE TO 4TH AVENUE
(streetscape restoration)
Start: April 4, 8:00 a.m. End: April 30, 5:00 p.m.

April 21

Road Work For Friday

NEW

CONFEDERATION DRIVE SOUTH BOUND LEFT TURN BAY CLOSED FROM CHANDLER PLACE TO MILTON STREET
(sanitary main inspections)
Start: April 21, 9:00 a.m. End: April 21, 3:00 p.m.

HIGHWAY 11 NORTH BOUND CURB LANE CLOSED FROM VICTOR ROAD TO HIGHWAY 16
(ditch grading)
Start: April 21, 9:00 a.m. End: April 21, 6:00 p.m.

ONGOING

RUTH STREET EAST BOUND CURB LANE CLOSED FROM ST HENRY AVENUE TO HERMAN AVENUE
(concrete curb repair)
Start: April 20, 7:00 a.m. End: April 21, 4:00 p.m.

WARMAN ROAD SOUTH BOUND LEFT TURN LANE CLOSED AT UMEA VAST PARK
(Lawson Heights shopping centre construction)
Start: March 31, 8:00 a.m. End: April 21, 4:00 p.m.

AIRPORT DRIVE NORTH, SOUTH & EAST BOUND MEDIAN LANES CLOSED FROM CLAYPOOL DRIVE TO CYNTHIA STREET
(manhole repairs)
Start: April 20, 9:00 a.m. End: April 22, 4:00 p.m.

SPADINA CRESCENT WEST BOUND PARKING LANE CLOSURE FROM AVENUE D TO AVENUE H
(road work)
Start: April 17, 7:00 a.m. End: April 25, 5:00 p.m.

AVE K S SOUTH BOUND FROM DUDLEY STREET TO SCHUYLER STREET
(concrete replacement)
Start: April 17, 7:00 a.m. End: April 26, 5:00 p.m.

21ST STREET PARKING RESTRICTIONS FROM 3RD AVENUE TO 4TH AVENUE
(streetscape restoration)
Start: April 4, 8:00 a.m. End: April 30, 5:00 p.m.

April 20

Road Work For Thursday

NEW

33RD STREET EAST BOUND MEDIAN AND CURB LANES CLOSED, WEST BOUND MEDIAN LANE CLOSED FROM LATRACE ROAD TO HUGHES DRIVE
(roadway patching)
Start: April 20, 7:00 a.m. End: April 20, 4:00 p.m.

RUTH STREET EAST BOUND CURB LANE CLOSED FROM ST HENRY AVENUE TO HERMAN AVENUE
(concrete curb repair)
Start: April 20, 7:00 a.m. End: April 21, 4:00 p.m.

CONFEDERATION DRIVE NORTH & SOUTH BOUND MEDIAN LANES CLOSED AT MASSEY DRIVE
(roadway patching)
Start: April 20, 7:00 a.m. End: April 20, 5:00 p.m.

CIRCLE DRIVE WEST NORTH BOUND RAMP TO 22ND STREET CURB LANE CLOSED
(streetlight repairs)
Start: April 20, 9:00 a.m. End: April 20, 3:00 p.m.

AIRPORT DRIVE NORTH, SOUTH  & EAST BOUND MEDIAN LANES CLOSED FROM CLAYPOOL DRIVE TO CYNTHIA STREET
(manhole repairs)
Start: April 20, 9:00 a.m. End: April 22, 4:00 p.m.

3RD AVENUE SOUTH BOUND CLOSED FROM 21ST STREET TO 20TH STREET
(crane lift)
Start: April 20, 10:30 a.m. End: April 20, 1:30 p.m.

NIGHT WORK

SID BUCKWOLD BRIDGE NORTH AND SOUTH BOUND MEDIAN LANES CLOSED
(deck testing)
Start: April 20, 7:00 p.m. End: April 20, 11:00 p.m.

IDYLWYLD DRIVE NORTH & SOUTH BOUND MEDIAN LANES CLOSED FROM SPADINA CRESCENT TO 20TH STREET
(bridge testing)
Start: April 19, 7:00 p.m. End: April 20, 1:00 a.m.

SID BUCKWOLD BRIDGE NORTH AND SOUTH BOUND CURB AND CENTER LANES CLOSED
(deck testing)
Start: April 20, 11:00 p.m. End: April 21, 6:00 a.m.

IDYLWYLD DRIVE NORTH & SOUTH BOUND CURB LANES CLOSED FROM SPADINA CRESCENT TO 20TH STREET
(bridge testing)
Start: April 20, 1:00 a.m. End: April 20, 6:00 a.m.

ONGOING

22ND STREET EAST BOUND LANES CLOSED FROM WITNEY AVENUE TO AVENUE W
(valve replacement)
Start: April 19, 9:00 a.m. End: April 20, 3:00 p.m.

WARMAN ROAD SOUTH BOUND LEFT TURN LANE CLOSED AT UMEA VAST PARK
(Lawson Heights shopping center construction)
Start: March 31, 8:00 a.m. End: April 21, 4:00 p.m.

SPADINA CRESCENT WEST BOUND PARKING LANE CLOSURE FROM AVENUE D TO AVENUE H
(road work)
Start: April 17, 7:00 a.m. End: April 25, 5:00 p.m.

21ST STREET PARKING RESTRICTIONS FROM 3RD AVENUE TO 4TH AVENUE
(streetscape restoration)
Start: April 4, 8:00 a.m. End: April 30, 5:00 p.m.

April 19

Road Work For Wednesday

NEW

BROADWAY AVENUE NORTH & SOUTH BOUND MEDIAN LANES CLOSED FROM MAPLE STREEET TO TAYLOR STREET
(roadway patching)
Start: April 19, 7:00 a.m. End: April 19, 4:00 p.m.

COLLEGE DRIVE EAST BOUND CURB & MIDDLE LANES CLOSED FROM MUNROE AVENUE TO WIGGINS AVENUE
(roadway patching)
Start: April 19, 7:00 a.m. End: April 19, 4:00 p.m.

8TH STREET EAST & WEST BOUND MEDIAN LANES CLOSED AT EASTLAKE AVENUE
(roadway patching)
Start: April 19, 7:00 a.m. End: April 19, 5:00 p.m.

PRESTON AVENUE SOUTH BOUND LANES CLOSED FROM 3RD STREET TO TAYLOR STREET
(roadway patching)
Start: April 19, 7:00 a.m. End: April 19, 5:00 p.m.

22ND STREET EAST BOUND LANES CLOSED FROM WITNEY AVENUE TO AVENUE W
(valve replacement)
Start: April 19, 9:00 a.m. End: April 20, 3:00 p.m.

CIRCLE DRIVE WEST SOUTH BOUND CURB LANE CLOSED FROM 33RD STREET TO LAURIER DRIVE
(guardrail repairs)
Start: April 19, 9:00 a.m. End: April 19, 3:00 p.m

NIGHT WORK

IDYLWYLD DRIVE NORTH BOUND CURB LANE AND EXIT RAMP TO 1ST AVENUE CLOSED OFF OF SID BUCKWOLD BRIDGE
(deck testing)
Start: April 18, 7:00 p.m. End: April 19, 7:00 a.m.

IDYLWYLD DRIVE NORTH & SOUTH BOUND MEDIAN LANES CLOSED OVER SID BUCKWOLD BRIDGE
(bridge testing)
Start: April 19, 7:00 p.m. End: April 20, 1:00 a.m.

ONGOING

8TH STREET EAST BOUND ROAD CLOSED FROM EMERSON AVENUE TO WALPOLE AVENUE
(water main repairs)
Two-way traffic will be maintained in the WB lanes.
Start: April 18, 9:00 a.m. End: April 19, 5:00 p.m.

WARMAN ROAD SOUTH BOUND LEFT TURN LANE CLOSED AT UMEA VAST PARK
(Lawson Heights shopping center construction)
Start: March 31, 8:00 a.m. End: April 21, 4:00 p.m.

SPADINA CRESCENT WEST BOUND PARKING LANE CLOSURE FROM AVENUE D TO AVENUE H
(road work)
Start: April 17, 7:00 a.m. End: April 25, 5:00 p.m.

21ST STREET PARKING RESTRICTIONS FROM 3RD AVENUE TO 4TH AVENUE
(streetscape restoration)
Start: April 4, 8:00 a.m. End: April 30, 5:00 p.m.

April 18

Road Work For Tuesday

NEW

3RD AVENUE SOUTH BOUND ROAD CLOSED FROM 19TH STREET TO SPADINA CRESCENT
(patch paving)
Start: April 18, 7:00 a.m. End: April 18, 5:00 p.m.

1ST AVENUE NORTH BOUND CURB LANE CLOSED AT 22ND STREET
(roadway patching)
Start: April 18, 7:00 a.m. End: April 18, 5:00 p.m.

1ST AVENUE NORTH BOUND CLOSED AT 24TH STREET, 25TH STREET EAST BOUND CURB LANE CLOSED FROM 25TH STREET TO 24TH STREET
(roadway patching)
Start: April 18, 7:00 a.m. End: April 18, 5:00 p.m.

IDYLWYLD DRIVE FREEWAY NORTH BOUND CURB LANE CLOSED FROM 8TH STREET EXIT ACROSS SID BUCKWOLD BRIDGE TO 19TH STREET
(pothole repair)
Start: April 18, 9:00 a.m. End: April 18, 1:00 p.m.

QUEEN STREET ROAD CLOSED FROM 9TH AVENUE TO SPADINA CRESCENT
(water & sewer repair)
Start: April 18, 9:00 a.m. End: April 18, 4:00 p.m.

3RD AVENUE SOUTH BOUND ROAD CLOSED FROM 23RD STREET TO 22ND STREET
(water & sewer work)
Start: April 18, 9:00 a.m. End: April 18, 4:00 p.m.

8TH STREET EAST BOUND ROAD CLOSED FROM EMERSON AVENUE TO WALPOLE AVENUE
(water main repairs)
Two-way traffic will be maintained in the WB lanes.
Start: April 18, 9:00 a.m. End: April 19, 5:00 p.m.

2ND AVENUE NORTH & SOUTH BOUND LEFT TURN BAYS CLOSED AT 26TH STREET
(sanitary sewer inspection)
Start: April 18, 11:00 a.m. End: April 18, 1:00 p.m.

NIGHT WORK

IDYLWYLD DRIVE NORTH BOUND CURB LANE AND IDYLWYLD DRIVE NORTH BOUND EXIT RAMP TO 1ST AVENUE CLOSED
(deck testing)
Start: April 18, 7:00 p.m. End: April 19, 7:00 a.m.

ONGOING

WARMAN ROAD SOUTH BOUND LEFT TURN LANE CLOSED AT UMEA VAST PARK
(Lawson Heights shopping center construction)
Start: March 31, 8:00 a.m. End: April 21, 4:00 p.m.

SPADINA CRESCENT WEST BOUND PARKING LANE CLOSURE FROM AVENUE D TO AVENUE H
(road work)
Start: April 17, 7:00 a.m. End: April 25, 5:00 p.m.

21ST STREET PARKING RESTRICTIONS FROM 3RD AVENUE TO 4TH AVENUE
(streetscape restoration)
Start: April 4, 8:00 a.m. End: April 30, 5:00 p.m.

April 17

Road Work For Monday

NEW

SPADINA CRESCENT WEST BOUND PARKING LANE CLOSURE FROM AVENUE D TO AVENUE H
(road work)
Start: April 17, 7:00 a.m. End: April 25, 5:00 p.m.

7TH AVENUE ROAD CLOSED FROM KING STREET TO QUEEN STREET
(sewer & water repairs)
Start: April 17, 8:00 a.m. End: April 17, 4:00 p.m.

QUEEN STREET ROAD CLOSED FROM 7TH AVENUE TO 8TH AVENUE
(water & sewer repair)
Start: April 17, 8:00 a.m. End: April 17, 4:00 p.m.

ONGOING

WARMAN ROAD SOUTH BOUND LEFT TURN LANE CLOSED AT UMEA VAST PARK
(Lawson Heights shopping center construction)
Start: March 31, 8:00 a.m. End: April 21, 4:00 p.m.

21ST STREET PARKING RESTRICTIONS FROM 3RD AVENUE TO 4TH AVENUE
(streetscape restoration)
Start: April 4, 8:00 a.m. End: April 30, 5:00 p.m.

April 13

Road Work For Thursday

NEW

QUEEN STREET ROAD CLOSED FROM 4TH AVENUE TO 5TH AVENUE
(water & sewer repair)
Start: April 13, 8:00 a.m. End: April 13, 5:00 p.m.

QUEEN STREET ROAD CLOSED FROM 6TH AVENUE TO 5TH AVENUE
(water & sewer repair)
Start: April 13, 8:00 a.m. End: April 13, 5:00 p.m.

CLARENCE AVENUE NORTH BOUND MEDIAN LANE & SOUTH BOUND LEFT TURN BAY CLOSED AT MELVILLE STREET
(streetlight replacement)
Start: April 13, 9:00 a.m. End: April 13, 12:00 p.m.

COLLEGE DRIVE EAST BOUND CENTRE LANE CLOSED FROM CENTRAL AVENUE TO MCKERCHER DRIVE
(pothole patching)
Start: April 13, 9:00 a.m. End: April 13, 1:00 p.m.

AIRPORT DRIVE EAST BOUND MEDIAN LANE CLOSED, WEST BOUND CURB LANE CLOSED FROM CARDINAL CRESCENT TO CIRCLE DRIVE WEST
(sanitary sewer inspections)
Start: April 13, 9:00 a.m. End: April 13, 3:00 p.m.

3RD AVENUE SOUTH BOUND ROAD CLOSED FROM 21ST STREET TO 20TH STREET
(crane lift)
Start: April 13, 10:30 a.m. End: April 13, 1:30 p.m.

ONGOING

WARMAN ROAD SOUTH BOUND LEFT TURN LANE CLOSED AT UMEA VAST PARK
(Lawson Heights shopping center construction)
Start: March 31, 8:00 a.m. End: April 21, 4:00 p.m.

21ST STREET PARKING RESTRICTIONS FROM 3RD AVENUE TO 4TH AVENUE
(streetscape restoration)
Start: April 4, 8:00 a.m. End: April 30, 5:00 p.m.

April 12

Road Work For Wednesday

NEW

IDYLWYLD DRIVE FREEWAY SOUTH BOUND MEDIAN LANE CLOSED AT MAIN STREET
(sewer inspection on exit between 8th Street and Sid Buckwold Bridge)
Start: April 12, 9:00 a.m. End: April 12, 11:00 a.m.

WIGGINS AVENUE FULL CLOSURE AT THE INTERSECTION OF 14TH STREET
(cctv sewer inspection)
Start: April 12, 11:00 a.m. End: April 12, 1:00 p.m.

ONGOING

SPADINA CRESCENT ROAD CLOSED FROM DUDLEY STREET TO SCHUYLER STREET
(W&S construction)
Start: April 3, 7:00 a.m. End: April 12, 5:00 p.m.

COLLEGE DRIVE EAST BOUND CURB LANE CLOSED FROM CUMBERLAND AVENUE TO FIELD HOUSE
(construction)
Start: April 3, 7:00 a.m. End: April 12, 6:00 p.m.

WARMAN ROAD SOUTH BOUND LEFT TURN LANE CLOSED AT UMEA VAST PARK
(Lawson Heights shopping center construction)
Start: March 31, 8:00 a.m. End: April 21, 4:00 p.m.

21ST STREET PARKING RESTRICTIONS FROM 3RD AVENUE TO 4TH AVENUE
(streetscape restoration)
Start: April 4, 8:00 a.m. End: April 30, 5:00 p.m.